Improving the connection between Mérida and the Madrid–Extremadura–Portuguese border line by upgrading the Mérida–Aljucén section, widening the track to double track and bringing it into line with ADIF’s stringent safety and comfort standards.
During the summer, we carried out drilling work with the utmost precision and safety.
📸 Pictured: Drilling work at the construction site next to the river.